Project Location: Suffield Block
Project Scope: The scope of the project is to upsize
and replace the existing 6” flare header with 8” flare
header.

Project Highlights:
• Completed site scanning in 4 days
• Completed flare system piping studies
• Conducted multi-discipline design review
• Provided piping ISO and Bill of Material for the project
• Fixed bid the mechanical construction
• Shop fabricated 100% of project piping
• Completed 98% of site construction while facility is live
• 2 days for final bolt up
• No re-work or field modifications