Project Location: Central Britnell heavy oil facility
Project Constraints:
• No Model of existing facility
Project Highlights:
• Created 3D rending of the affected area
• Conducted multi-discipline design review
• Provided piping ISO and Bill of Material for the project
• Shop fabricated 100% of 8” piping
• Internally coated piping
• Created pile location plan
• Completed 98% of site construction while facility is running
• 0% re-work on internally coated piping