Project Location: Wembley Gas Plant
Project Constraints:
• No model of the facility existed
• Sour Site
Project Highlights:
• Created 3D rending of the affected area
• Conducted multi-discipline design review
• Provided piping ISO and Bill of Material for the project
• Fixed bid the mechanical and civil construction
• Shop fabricated 100% of project piping
• Modular fabricated pipe bridge and ship to site for installation
• Created pile location plan
• Completed 98% of site construction while facility is running
• No re-work or field modifications